CPD-05 vs CPD-08
Two sizes of the same frame. The difference that decides the order is usually aisle width or the weight of a full pallet — not the number on the plate.
| CPD-05 | CPD-08 | |
|---|---|---|
| Model | CPD-05 | CPD-08 |
| Rated capacity | 0.5 t | 0.8 t |
| capacity | 0.5 t | 0.5 t |
| standard | ||
| power | Electric | Electric |
Rows that differ are marked. Rows without a mark are identical on both builds.
Choose CPD-05 when
Three-wheel, 0.5 t. Bought where the aisle is under 2.2 m and the load is a euro pallet at low height. The narrowest turning circle in the range.
The building is the constraint: floor loading, door width, or a mezzanine that will not take the heavier chassis. CPD-05 is also the cheaper unit, so a fleet that never loads to the plate should not pay for the frame it does not use.
CPD-05 specificationChoose CPD-08 when
Three-wheel, 0.8 t. The step up from 0.5 t for a workshop that occasionally lifts a full drum or a machine skid.
The load is the constraint: pallets that arrive over-weight, attachments that shift the centre of gravity forward, or a mast tall enough that residual capacity falls away at height. Buying one size up is cheaper than a second handling step.
CPD-08 specificationNot sure which one
Send the aisle width, the load and the lift height. We answer with the model and the reason, not both brochures.