Compare digging depth, reach and transport weight against the trench you actually dig. The smaller machine wins where access and transport are the constraint.
| Selection factor | WE12 | WE18 |
|---|---|---|
| Primary check | Trench depth and reach | Trench depth and reach |
| Access | Transport weight and width | Transport weight and width |
| Attachment | Bucket / breaker fitment | Bucket / breaker fitment |
Only verified statements are shown. Prices, lead times, MOQ and warranty terms are not published without a written quotation.
Model codes are a shortlist, not a decision. Send load, aisle or gate width, lift height, hours per shift and destination port; we return the matched specification and a written price.
Describe the job; we reply with a written specification and price within 24 hours.
Compare digging depth, reach and transport weight against the trench you actually dig. The smaller machine wins where access and transport are the constraint.
No. Prices are issued in a written quotation against the configuration and destination.
Yes. Model-level specification sheets and CE documentation are supplied from the originals on request.
Load, aisle or gate width, lift height, shift hours and destination port are enough to start.